Strict quality inspection

ISO quality management system and strict factory inspection process (strict condenser pressure test, electronic control system inspection, equipment trial operation, etc.) ensure that the equipment meets the standards before leaving the factory.

11.jpg12.jpg

Coil Pressure Test

13_副本.jpg

Overall Equipment Debugging

14_副本.jpg

Water testing


Get the latest price? We will reply as soon as possible (within 12 hours)